ISO 19650 explained: the parts, the CDE, the EIR and the BEP

ISO 19650 is the series of international standards most BIM requirements now refer to. The standards themselves are sold by ISO and national standards bodies; this page summarises what they cover, using public sources, so you can read a brief or a BEP with confidence.

By Julian Bringold ·

Quick answer

ISO 19650 is a series of international standards for managing information on built assets with BIM, from design through operation. It sets out who defines the information requirements, how the delivery team plans to meet them in a BIM execution plan (BEP), and how information moves through a common data environment (CDE).

The six parts of ISO 19650

PartSubjectYear
ISO 19650-1Concepts and principles2018
ISO 19650-2Delivery phase of assets2018
ISO 19650-3Operational phase of assets2020
ISO 19650-4Information exchange2022
ISO 19650-5Security-minded information management2020
ISO 19650-6Health and safety information2025

What ISO 19650 is

ISO 19650 covers the organisation and digitisation of information about buildings and civil engineering works, including BIM. It does not tell you which software to use or how to model a wall. It describes who asks for information, who produces it, how it is planned, checked, shared and stored, and how it is handed over for operation.

The series grew out of earlier UK specifications, in particular the PAS 1192 series, which it internationalised. Parts 1 and 2 came first, in 2018. Part 6, on health and safety information, followed in 2025 and replaces PAS 1192-6:2018, according to BSI.

The information requirements chain: OIR, AIR, PIR and EIR

ISO 19650 organises requirements in layers. Organizational information requirements (OIR) describe what an organisation needs to know to run its business. Asset information requirements (AIR) describe what it needs about each asset it owns or operates. Project information requirements (PIR) describe what it needs for a given project.

Exchange information requirements (EIR) are the most concrete layer: they state what a delivery team must hand over under a given appointment. On French projects, the BIM brief (cahier des charges BIM) plays a comparable role; our page on the French BIM charter, brief and protocol compares the two vocabularies.

Many EIR items concern what the models must contain: a property on a type of object, a classification, a naming rule. Those items can be written as IDS files and checked automatically, as explained on our page about BIM requirements and IDS.

The common data environment (CDE)

ISO 19650 calls the CDE the agreed source of information for a project or asset. It is not a particular product: it is the combination of a platform and the agreed process for using it.

As NBS explained in 2019, information in a CDE moves through four states: work in progress, shared, published and archived. Moving from one state to the next should go through an agreed approval and authorisation process. Each information container carries a unique identifier and metadata such as its status or suitability, its revision and its classification.

The BEP and the delivery plans

The BIM execution plan (BEP) is the delivery team's answer to the exchange information requirements. ISO 19650-2 distinguishes a pre-appointment BEP, which shows what the team can do, from a post-appointment BEP, which the team then works to.

Delivery is then planned in information delivery plans: a task information delivery plan (TIDP) for each task team, brought together in a master information delivery plan (MIDP) for the whole delivery team.

From the UK BIM Framework to the IMI Framework

In the UK, the UK BIM Framework was launched in October 2019 to support the adoption of ISO 19650. It was developed jointly by the UK BIM Alliance, BSI and the Centre for Digital Built Britain.

It has since been renamed the IMI Framework (Information Management Initiative) and remains a free online resource, according to nima, which has supported it alongside BSI since March 2022. Its guidance is a good place to start before buying the standards themselves.

Where SeveUp App fits

We do not claim that SeveUp App is ISO 19650 compliant, and using it does not make a project compliant. It helps with some of the checks the standard expects around information exchange.

SeveUp App checks each IFC model you upload against IDS files, so you can see whether a delivery carries the information the requirements ask for: see checking BIM requirements with IDS. It keeps every revision of a model, so you can compare what was delivered over time: see managing IFC models. It also lets you raise and follow BIM issues on the elements concerned.

If your client asks for asset data at handover, our page on COBie explains what that format contains.

Frequently asked questions

What is ISO 19650 in simple terms?
A series of international standards that describes how to manage information on a building or infrastructure asset with BIM: who sets the requirements, how the delivery team plans to meet them, and how information is shared, approved and stored.
How many parts does ISO 19650 have?
Six as of October 2026: concepts and principles (part 1), the delivery phase (part 2), the operational phase (part 3), information exchange (part 4), security (part 5) and health and safety information (part 6, published in 2025).
What is a common data environment in ISO 19650?
The agreed source of information for a project or asset. Information in it moves from work in progress to shared, published and archived, with an agreed approval step between states.
What is the difference between the EIR and the BEP?
The EIR is what the appointing party asks for under an appointment. The BEP is the delivery team's plan for meeting those requirements, first before appointment to show its capability, then after appointment as a working document.
Is ISO 19650 free to read?
No. The standards are sold by ISO and national standards bodies. Free guidance exists, notably the IMI Framework in the UK, formerly the UK BIM Framework.
Is SeveUp App ISO 19650 compliant?
We do not make that claim. SeveUp App helps you check that IFC deliveries carry the information your requirements ask for, using IDS, and keeps the history of model revisions and issues.

Sources

Sources checked on October 21, 2026.